The brick and concrete primary settlement tanks required a new tank lining as they were leaking effluent into the surrounding soil.
We proposed the application of a spray applied polyurea coating to form a seamless and fluid tight tank lining. Following draining and cleaning of the tanks by the client we supplied and supervised the installation of suitable scaffold access.
The tank internals were then prepared by method of abrasive blasting to ensure excellent adhesion of the new polyurea lining.
Once prepared and cleaned a cementitious fairing coat was applied to the tank walls to fill imperfections in the substrate to provide a suitable surface for the tank lining. When applying polyurea tank linings removing imperfections such as missing pointing is essential to aid the effective application of the new lining.
Finally the tank lining was tested for porosity using a DC holiday spark tester and where found touched in using the same material.